All blogs
Supply Chain Traceability·June 2026·9 min read

EUDR Geolocation in Practice: What Plot-Level Data Actually Has to Prove

Polygons, cut-off dates and due diligence statements — a practical read on what exporters need to have ready.

ARTICLE HERO IMAGE — 1600×900

The requirement in plain terms

The EU Deforestation Regulation asks operators to demonstrate that covered commodities were not produced on land deforested after the regulation’s cut-off date. In practice this means three things must exist together: geolocation of the production plots, evidence of land-use status at and after the cut-off, and a documented due diligence process linking the two to a specific consignment.

Points versus polygons

A single coordinate is permitted only for very small plots; beyond that threshold a polygon is required. In smallholder geographies this is where projects stall — capturing thousands of accurate boundaries requires field teams, GPS-capable devices and a validation workflow that rejects sloppy walks. Budget for the fieldwork, not just the software.

Evidence of land-use status

Satellite time series is the practical instrument: canopy and land-cover analysis at the plot boundary, from before the cut-off date to the present. Where the imagery is ambiguous — smallholder plots under shade, mixed cropping, cloud-heavy geographies — remote sensing must be corroborated by field records rather than treated as final.

Linking plots to consignments

This is the step most operators underestimate. Having a database of mapped plots does not satisfy the regulation; the due diligence statement has to reference the plots that produced the specific shipment. That requires batch-level traceability through aggregation and processing, which returns us to identity capture at intake.

What to have ready before your buyer asks

A polygon dataset with recorded accuracy and capture date. A land-use assessment per plot with the method stated. A batch genealogy resolving each consignment to its contributing plots. A risk assessment and mitigation record. And a named owner inside your organisation who can produce all four within days, not weeks.

See how CarbonBhoomi handles this in practice.

A 30-minute walkthrough with your commodity, geography and compliance obligations on screen.

Book Demo